Skip to content

First Mission Study

This tutorial creates the minimum mission structure required to validate ASTROLAB geometry and reporting.

Objective

Create a spacecraft and a ground asset, then run a simple analysis to verify that the state, access, plots, and reports are connected.

Steps

  1. Create or open a scenario.
  2. Set a scenario start and end date.
  3. Create a spacecraft asset.
  4. Configure orbit and propagation settings.
  5. Create a facility or target.
  6. Run a simple link/contact analysis between spacecraft and ground asset.
  7. Inspect access intervals and plots.

Validation Checklist

Check Expected result
Spacecraft appears in viewer Orbit and model are visible.
Ground asset appears in viewer Marker is located at the configured geodetic position.
Access analysis completes Progress reaches 100 percent.
Intervals are produced At least one contact window appears if geometry permits.
Report opens Summary and interval table are readable.

Common Issues

Symptom Likely cause
No intervals Ground asset out of view, wrong time span, or constraints too strict.
Propagation failure Propagator settings or environment data are invalid.
Plot is empty Analysis did not store payload or selected template expects different data.